How the project after the removal of scaffolding

The removal of the shelf procedures should the removal of top-down step by step, the first demolition of protecting the safety net, scaffolding boards and exclusive wood, then in turn removed the upper part of cross cover fastener and then shot. Scissors before removing the next one to be tied up supporting the temporary ramp to prevent the shelf tilting side to push or pull against the side by way of demolition. Split shot or release lever must be collaborative operation, the steel pipe to be removed by the root passed down, do not drop from a height to. To prevent the tube break or accident, removed the fastener tool to focus on the stable lifting bags filled with down, do not come from the top left. Removal of the shelf, the work surface around the import and export of Department must send someone to look-out, non-workers into the danger zone, should be added to the temporary removal of the shelf Wei Dang, wires and equipment operations area hinder, they should contact in advance with the relevant units transfer or removal of additional protection.

dismantling scaffolding:

1) shelf removed, should be classified work area, located around the fence or the erection of warning signs, the ground command of the designated persons prohibited from entering non-operating personnel.

2) removal of the high place, must wear a helmet, seat belt, tie leggings, wear soft-soled shoes.

3) The removal order should be followed by the last on, first take after the split, take the first after the demolition of the principle. Which is to split rails, scaffold boards, scissors, bracing, after demolition of a small bar, big bar, pole, etc., according to the principles of clear step in turn, up and down at the same time to non-demolition.

4) split pole, the pole should be embraced and then open the last two buttons, removed a large bar, bracing, bridging, should be removed before the middle button, and then try to jack up the middle, and then solution buckle ends.

5) removal when unity of command, from top to bottom echo, motor coordination, when solved with another person the knot, they would first notify the other party, to prevent falling.

6) The removal of large areas of the shelf should be reserved before the ramp, loading platform, channel hop and other boats in advance of reinforcement, so that after the demolition to ensure its integrity, security and stability.

7) The removal should not damage the doors and windows, glass, fall-pipe, eaves tile, the underground ditches and other items.

8) Remove the material, application of a rope leash, using pulley slowly transported under strictly prohibited throw, transported to the surface of the material should refer to security sites, with the demolition with the transport, sorting stacking, clear day, the day of demolition, remove the fasteners or wire to focus recycled.

Jan. 10 more knowledge of scaffolding and aluminum beam description, please visit this site and the scaffolding bbs to the website: http://www.iscaffold.com.cn 24 hour customer service phone!

http://www.iscaffold.com.cn/news/news_158.html http://www.iscaffold.com.cn/news/news_159.html http://www.iscaffold.com.cn/news/news_160.html http://www.iscaffold.com.cn/news/news_161.html http://www.iscaffold.com.cn/news/news_162.html